Skip to content Transforming your infrastructure into living assets

Monitoring of West Bay towers l Qatar

Project summary:
Monitoring of Sensitive Buildings on the Layout of Red Line Doha Metro
Location
Doha, Qatar
Period of the service
2014-2017
Sixense solutions used
TO DO MAP

Tunnelling under skyscrapers

 

The Doha Metro is a planned rapid transit system in Qatar’s capital city, scheduled to become operational by the end of 2019. In mid May 2013, the Impregilo – SK E&C – Galfar Al Misnad Joint Venture (ISG) was awarded the construction of the Red Line North (RLN) segment, running from Musheireb to Al Khor North.

 

This line goes through West Bay area, the business district with its iconic skyline Sixense was awarded the instrumentation and monitoring services on RLN in 2014. Within the monitoring contract, special attention was focused on sensitive buildings.

 

Comprehensive monitoring

 

Located directly next to the future West Bay Station, Barzan Tower requested special instrumentation. Whilst the 2 tunnel boring machines (TBM) were passing under the basement parking of the 15,000 m2 tower in early 2015, ISG requested to get precise measurements of the movements of the tower and its foundations. Sixense installed 3 theodolites to monitor the building facades and the roof of the parking, as well as tiltmeters in the elevator shaft for data verification.

 

A monitoring system comprising of tiltmeters on the elevator shafts, geophones and accelerometers as well as liquid levelling cells has been deployed on five other major buildings located on the alignment of the TBMs: Mariott City Centre Hotel, Gate Mall, Ministry of Interior, Qatar Insurance Company and Qatar Islamic Bank.

 

On the latter structure, a Cyclops was monitoring the movements of the architecturally distinctive lower part of the tower while tiltmeters monitored the basement.

 

Real-time follow up with Geoscope was provided, with continuous adjustment to the TBMs progress and parameters.
The data obtained provided the assurance necessary to allow the safe passage of the TBMs and maintain all the buildings integrity.

Images of the project

12

Cyclops (RTS)

220

Building monitoring points (prisms)

69

Manual levelling points

631

Ground monitoring points

9

Geophones

10

Tiltmeters

8

Liquid cells

6

Accelerometers

Similar projects

Geographic Area

Geographic area

GEOGRAPHIC AREA text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Africa & Middle East
Geographic Area

Sector segment

MARKET SEGMENT text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Buildings
Geographic Area

Sixense offers

SIXENSE OFFERS Description text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Monitoring