Skip to content Transforming your infrastructure into living assets

Monitoring for South Gippsland Highway Realignment | Australia

Project summary:
Real-time remote monitoring of earthworks
Location
Gippsland, Australia
Period of the service
2020 - 2024
Sixense solutions used
TO DO MAP

About South Gippsland Highway Realignment

The South Gippsland Highway project involves the realignment of a 3.4 km section of highway in Koonwarra to avoid several existing low speed curves and steep grades, along with two new bridges and an underpass.

The project is delivered by Major Road Projects Victoria and is designed and constructed by CPB Contractors. Sixense is contracted to provide geotechnical instrumentation and monitoring services for the project.

 

What we’ve delivered

Sixense has supplied and installed geotechnical sensors, including inclinometers, piezometers and extensometers, to monitor earthwork foundations for the new highway construction.

Due to the remote location of the project, all sensors are automated, with wireless data transfer to Sixense servers.

Geoscope is used to integrate all sensor data, generate reports, and send alarms to stakeholders in case of sensor threshold exceedances.

Images of the project

12

ground water piezometers

1

automatic Extensometer

2

automatic Inclinometers

48

months of continuous remote operation

Similar projects

Geographic Area

Geographic area

GEOGRAPHIC AREA text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Asia & Oceania
Geographic Area

Sector segment

MARKET SEGMENT text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Road networks
Geographic Area

Sixense offers

SIXENSE OFFERS Description text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Monitoring