Skip to content Transforming your infrastructure into living assets

Infrastructure monitoring on Crossrail C704 | United Kingdom

Project summary:
Major infrastructure monitoring
Location
London, United Kingdom
Period of the service
2010 - 2017
Sixense solutions used
TO DO MAP

During and after construction

Eight tunnel boring machines have weaved their way under the existing infrastructure of Central London removing 4.5 million tonnes of earth along the alignment. 42 km of tunnels, 10 completely new stations and 30 upgraded stations make up the biggest construction project undertaken in UK. The dense urban environment associated with a major capital city has meant that the entire route has a requirement for comprehensive movement monitoring, before, during and, because of the regional geology, after construction has taken place.

Crossrail decided to provide an umbrella monitoring system that would allow, protection of existing assets and compliance with 3rd party regulatory requirements such as Network Rail, London Underground, Docklands Light Railway and various utility providers and property owners. This system would also provide supplemental information to the many contractors working simultaneously on Crossrail who are expected to undertake their own construction related monitoring to protect their site and neighbours.

 

A partnership

The movement monitoring system consists of a wealth of automatic structural and geotechnical sensors as well as 215+ automatic total stations (ATS), working in groups along the alignment.

Sixense, have maintained, managed and repaired this overseeing monitoring system. To deliver a robust, reliable and accurate monitoring system a number of crucial strategies have been implemented:

  • working in partnership with Crossrail to ensure their requirements are reflected in the ongoing management and maintenance programme for the existing instrumentation infrastructure
  • implementation of an automated KPI tool, studying the system parameters/trends, allowing real time diagnosis of instrument performance.
  • a proactive strategy of maintenance is then implemented prioritising and redirecting resources when necessary
  • upgrading of the monitoring system by using Geoscope software

Images of the project

215

Robotic Total Stations

20 000

Prisms

200

Tilt sensors

1 500

Electrolevel Beams

24/7

Coverage

Similar projects

Geographic Area

Geographic area

GEOGRAPHIC AREA text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Europe
Geographic Area

Sector segment

MARKET SEGMENT text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Buildings Browse Projects in Railways
Geographic Area

Sixense offers

SIXENSE OFFERS Description text to fill Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin dignissim orci dui, eu efficitur lectus feugiat ut.

Browse Projects in Monitoring